IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

369

matching recommendations
Reset
SIC 251 Household Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0652 # 10 Y:1999 10 1999 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $16,210 $10,000 Not Implemented
NC0161 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,160 $500 Not Implemented
NC0161 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,328 $20 Not Implemented
NC0161 # 03 Y:1999 03 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,140 $1,650 Implemented
NC0161 # 04 Y:1999 04 1999 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $160,533 $279,000 Not Implemented
NC0161 # 05 Y:1999 05 1999 BURN WASTE PAPER FOR HEAT $281 $0 Not Implemented
NC0159 # 01 Y:1999 01 1999 DISCONNECT BALLASTS $5,744 $100 Implemented
NC0159 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,313 $600 Implemented
NC0159 # 03 Y:1999 03 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,403 $0 Not Implemented
NC0159 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,446 $1,700 Not Implemented
NC0159 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $15,243 $1,500 Not Implemented
NC0159 # 06 Y:1999 06 1999 HEAT WATER WITH EXHAUST HEAT $1,789 $2,000 Implemented
NC0159 # 07 Y:1999 07 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $3,836 $20,000 Not Implemented
NC0159 # 08 Y:1999 08 1999 $165,125 $55,000 Not Implemented
TN0634 # 02 Y:1998 02 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $67,500 $50,000 Implemented
TN0634 # 13 Y:1998 13 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $310 $500 Implemented
TN0634 # 04 Y:1998 04 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $3,600 $0 Not Implemented
TN0634 # 05 Y:1998 05 1998 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,990 $8,575 Not Implemented
TN0634 # 06 Y:1998 06 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,990 $510 Implemented
TN0634 # 07 Y:1998 07 1998 USE MINIMUM STEAM OPERATING PRESSURE $1,460 $0 Not Implemented
TN0634 # 08 Y:1998 08 1998 AIR CONDITION ONLY SPACE NECESSARY $1,310 $0 Not Implemented
TN0634 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,038 $1,820 Implemented
TN0634 # 10 Y:1998 10 1998 INSULATE BARE EQUIPMENT $430 $390 Not Implemented
TN0634 # 11 Y:1998 11 1998 RECOVER WASTE HEAT FROM EQUIPMENT $320 $960 Implemented
TN0634 # 12 Y:1998 12 1998 REPAIR AND ELIMINATE STEAM LEAKS $310 $295 Implemented