Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
263
matching recommendationsSIC | 2515 | Mattresses And Bedsprings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0600 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $383 | $200 | Implemented |
NC0600 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $191 | $850 | Implemented |
NC0600 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,705 | $10,366 | Implemented |
TT0108 # 04 Y:2013 | 04 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $4,000 | $980 | Implemented |
TT0108 # 03 Y:2013 | 03 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,110 | $1,110 | Not Implemented |
TT0108 # 02 Y:2013 | 02 | 2013 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $5,367 | $8,075 | Not Implemented |
TT0108 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,126 | $10,709 | Implemented |
MZ0102 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,776 | $10,060 | Not Implemented |
MZ0102 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,327 | $2,000 | Implemented |
MZ0102 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,444 | $0 | Implemented |
MZ0102 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,326 | $16,800 | Implemented |
MZ0102 # 06 Y:2012 | 06 | 2012 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,370 | $2,270 | Implemented |
MZ0102 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $930 | $700 | Implemented |
NC0446 # 05 Y:2012 | 05 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $44,845 | $120,000 | Not Implemented |
NC0446 # 09 Y:2012 | 09 | 2012 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $28,690 | $71,725 | Not Implemented |
NC0446 # 08 Y:2012 | 08 | 2012 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,979 | $8,800 | Not Implemented |
NC0446 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,560 | $100 | Implemented |
NC0446 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,188 | $0 | Not Implemented |
NC0446 # 03 Y:2012 | 03 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $108,281 | $84,000 | Not Implemented |
NC0446 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $171,632 | $1,063,000 | Not Implemented |
NC0446 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,073 | $4,900 | Implemented |
NC0446 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $92,397 | $210,000 | Not Implemented |
NC0415 # 06 Y:2010 | 06 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $12,000 | $1,000 | Implemented |
NC0415 # 05 Y:2010 | 05 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $911 | $1,846 | Implemented |
NC0415 # 07 Y:2010 | 07 | 2010 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $8,000 | $15,750 | Implemented |