IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

254

matching recommendations
Reset
SIC 2515 Mattresses And Bedsprings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0132 # 04 Y:1999 04 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,114 $0 Not Implemented
NC0159 # 01 Y:1999 01 1999 DISCONNECT BALLASTS $5,744 $100 Implemented
NC0159 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,313 $600 Implemented
NC0159 # 03 Y:1999 03 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,403 $0 Not Implemented
NC0159 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,446 $1,700 Not Implemented
NC0159 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $15,243 $1,500 Not Implemented
NC0159 # 06 Y:1999 06 1999 HEAT WATER WITH EXHAUST HEAT $1,789 $2,000 Implemented
NC0159 # 07 Y:1999 07 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $3,836 $20,000 Not Implemented
NC0159 # 08 Y:1999 08 1999 IMPROVE SPACE COMFORT CONDITIONING $165,125 $55,000 Not Implemented
SF0150 # 01 Y:1998 01 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $300 $260 Not Implemented
SF0150 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $75 $147 Implemented
SF0150 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,331 $22,713 Not Implemented
SF0150 # 04 Y:1998 04 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $5,375 $0 Implemented
CO0407 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $6,210 $15,400 Not Implemented
CO0407 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $6,170 $8,790 Not Implemented
CO0407 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,710 $240 Implemented
CO0407 # 04 Y:1998 04 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $10,420 $600 Implemented
CO0407 # 05 Y:1998 05 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,380 $3,000 Not Implemented
CO0407 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $340 $0 Not Implemented
CO0407 # 07 Y:1998 07 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,145,000 $210,480 Implemented
MS0086 # 01 Y:1997 01 1997 USE SYNTHETIC LUBRICANT $1,444 $132 Implemented
MS0086 # 02 Y:1997 02 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,963 $5,372 Not Implemented
MS0086 # 03 Y:1997 03 1997 OPTIMIZE PLANT POWER FACTOR $1,998 $1,500 Implemented
MS0086 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $463 $880 Not Implemented
MS0086 # 05 Y:1997 05 1997 USE PHOTOCELL CONTROLS $3,037 $722 Not Implemented