Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
282
matching recommendationsSIC | 252 | Office Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0772 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,082 | $161,076 | Implemented |
UD0772 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,540 | $58,765 | Implemented |
UD0772 # 08 Y:2007 | 08 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $7,421 | $17,000 | Implemented |
DL0005 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,373 | $0 | Implemented |
DL0005 # 02 Y:2007 | 02 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $167,986 | $65,000 | Implemented |
DL0005 # 03 Y:2007 | 03 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $92,780 | $18,375 | Implemented |
DL0005 # 04 Y:2007 | 04 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,554 | $1,772 | Implemented |
DL0005 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,314 | $108,987 | Implemented |
MA0615 # 10 Y:2007 | 10 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,121 | $3,200 | Implemented |
MA0615 # 09 Y:2007 | 09 | 2007 | OPTIMIZE PLANT POWER FACTOR | $4,673 | $18,500 | Implemented |
MA0615 # 07 Y:2007 | 07 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,155 | $0 | Implemented |
MA0615 # 06 Y:2007 | 06 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $10,518 | $13,000 | Implemented |
MA0615 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,214 | $800 | Implemented |
MA0615 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,125 | $0 | Implemented |
MA0615 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,604 | $84,300 | Implemented |
IC0093 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $737 | $0 | Implemented |
IC0093 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,546 | $700 | Implemented |
IC0093 # 01 Y:2004 | 01 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,168 | $3,600 | Implemented |
SU0169 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,194 | $26 | Implemented |
SU0169 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $168 | Implemented |
SU0169 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,694 | $0 | Implemented |
SU0169 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,040 | $348 | Implemented |
MS0228 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,344 | $276 | Implemented |
MS0228 # 05 Y:2003 | 05 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $323 | $0 | Implemented |
MS0228 # 03 Y:2003 | 03 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,499 | $2,540 | Implemented |