IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
SIC 2522 Office Furniture, Except Wood
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0005 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,373 $0 Implemented
MA0615 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $8,155 $0 Implemented
MA0615 # 06 Y:2007 06 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,518 $13,000 Implemented
MA0615 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,121 $3,200 Implemented
MA0615 # 09 Y:2007 09 2007 OPTIMIZE PLANT POWER FACTOR $4,673 $18,500 Implemented
MA0615 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,214 $800 Implemented
MA0615 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,125 $0 Implemented
MA0615 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,604 $84,300 Implemented
MS0228 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,344 $276 Implemented
MS0228 # 05 Y:2003 05 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $323 $0 Implemented
MS0228 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,499 $2,540 Implemented
AR0191 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $1,877 Implemented
AR0191 # 04 Y:2000 04 2000 USE MAGNETIC TECHNOLOGY TO TREAT WATER $12,000 $10,374 Implemented
AR0191 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $95,071 $13,210 Implemented
KU0542 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $330 Implemented
KU0542 # 04 Y:2000 04 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,730 $0 Implemented
WI0336 # 03 Y:1999 03 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,499 $0 Implemented
WI0336 # 02 Y:1999 02 1999 LEASE EQUIPMENT INSTEAD OF PURCHASING $22,800 $0 Implemented
MS0104 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,476 $54 Implemented
MS0104 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $0 Implemented
MS0104 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,962 $27,800 Implemented
MS0104 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $5,872 $12,115 Implemented
SD0186 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,357 $3,530 Implemented
SD0186 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,973 $500 Implemented
SD0186 # 06 Y:1998 06 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $2,785 $5,115 Implemented