IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
SIC 2541 Wood Partitions And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0764 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,540 $122,400 Implemented
MZ0184 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,232 $0 Implemented
MZ0184 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $357 $1,750 Implemented
MZ0184 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,705 $78,480 Implemented
NC0500 # 04 Y:2013 04 2013 REDUCE FLUID FLOW RATES $34,287 $18,000 Implemented
NC0500 # 12 Y:2013 12 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,622 $775 Implemented
NC0500 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,389 $7,000 Implemented
NC0500 # 10 Y:2013 10 2013 METER WASTE WATER $4,155 $4,200 Implemented
NC0500 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,293 $125 Implemented
NC0500 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $577 $875 Implemented
NC0500 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,558 $100 Implemented
NC0500 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $4,146 $200 Implemented
NC0500 # 02 Y:2013 02 2013 MAKE A NEW BY-PRODUCT $86,815 $250,000 Implemented
BD0380 # 02 Y:2010 02 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,928 $11 Implemented
LE0266 # 01 Y:2008 01 2008 INSTALL TIMERS AND/OR THERMOSTATS $42,137 $2,614 Implemented
UD0759 # 05 Y:2007 05 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,440 $0 Implemented
UD0759 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $664 $500 Implemented
UD0759 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,130 $0 Implemented
UD0759 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,276 $0 Implemented
UD0759 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,675 $0 Implemented
SF0302 # 07 Y:2005 07 2005 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $1,800 $250 Implemented
SF0302 # 08 Y:2005 08 2005 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $1,200 $0 Implemented
SF0302 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $2,584 Implemented
SF0302 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $474 $1,638 Implemented
SF0302 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $0 Implemented