Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
159
matching recommendationsSIC | 2542 | Partitions And Fixtures, Except Wood |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0546 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,392 | $25,659 | Implemented |
SD0546 # 02 Y:2017 | 02 | 2017 | USE PHOTOCELL CONTROLS | $8,753 | $17,253 | Implemented |
SD0546 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,299 | $2,500 | Implemented |
SD0546 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,431 | $6,068 | Implemented |
SD0546 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $419 | $1,000 | Implemented |
SD0546 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $989 | $400 | Implemented |
SD0542 # 08 Y:2017 | 08 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,153 | $2,288 | Implemented |
SD0542 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,740 | $1,500 | Implemented |
SD0542 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,743 | $11,288 | Implemented |
SD0542 # 02 Y:2017 | 02 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,069 | $31,000 | Implemented |
AM0719 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,680 | $41,400 | Implemented |
AM0719 # 07 Y:2016 | 07 | 2016 | KEEP LAMPS AND REFLECTORS CLEAN | $390 | $57 | Implemented |
AM0719 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $700 | $760 | Implemented |
AM0719 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $840 | $10 | Implemented |
AM0719 # 04 Y:2016 | 04 | 2016 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,440 | $2,000 | Implemented |
AM0719 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,110 | $6,410 | Implemented |
AM0719 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,350 | $1,000 | Implemented |
MZ0169 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $154 | $0 | Implemented |
MZ0169 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,080 | $7,000 | Implemented |
MZ0169 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,001 | $600 | Implemented |
MZ0169 # 05 Y:2015 | 05 | 2015 | CONDENSE OPERATION INTO ONE BUILDING | $1,574 | $0 | Implemented |
MZ0164 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,593 | $6,500 | Implemented |
MZ0164 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,200 | $1,430 | Implemented |
MZ0164 # 04 Y:2014 | 04 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $24,203 | $100,000 | Implemented |
MZ0164 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $71,454 | $0 | Implemented |