IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,622

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0485 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,838 $14,420 Implemented
WI0485 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $3,641 $7,095 Implemented
NC0308 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,359 $20,313 Implemented
NC0308 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,017 $2,450 Implemented
NC0308 # 04 Y:2005 04 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $13,767 $6,500 Implemented
NC0308 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,493 $2,000 Implemented
NC0308 # 07 Y:2005 07 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $867 $750 Implemented
NC0308 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $338 $160 Implemented
BD0280 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $10,565 $5,850 Implemented
BD0280 # 05 Y:2005 05 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $10,110 $1,000 Implemented
BD0280 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,514 $1,400 Implemented
BD0280 # 08 Y:2005 08 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,413 $2,000 Implemented
BD0280 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,944 $0 Implemented
MA0567 # 01 Y:2004 01 2004 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $70,900 $270,000 Implemented
MA0567 # 04 Y:2004 04 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $8,762 $1,000 Implemented
MA0567 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $4,156 $6,867 Implemented
MA0567 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $1,615 $1,369 Implemented
MA0566 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $148,951 $35,885 Implemented
MA0566 # 02 Y:2004 02 2004 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $113,441 $191,180 Implemented
MA0566 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33,400 $20,000 Implemented
MA0566 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $5,889 $3,076 Implemented
SU0199 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $144 $0 Implemented
SU0199 # 03 Y:2005 03 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $371,280 $13,500 Implemented
SU0199 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $7,434 $2,000 Implemented
UU0069 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,879 $11,735 Implemented