Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,622
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0272 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $612 | $60 | Implemented |
IA0272 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $1,313 | $1,862 | Implemented |
IA0272 # 09 Y:2001 | 09 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,544 | $445 | Implemented |
IA0272 # 11 Y:2001 | 11 | 2001 | MINIMIZE WATER USAGE | $1,414 | $35 | Implemented |
LL0112 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,154 | $1,200 | Implemented |
LL0112 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $5,437 | $9,810 | Implemented |
LL0112 # 05 Y:2001 | 05 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $353,891 | $50,860 | Implemented |
UD0626 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,653 | $0 | Implemented |
UD0626 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,326 | $1,000 | Implemented |
UD0626 # 04 Y:2001 | 04 | 2001 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,451 | $112 | Implemented |
UD0626 # 05 Y:2001 | 05 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,173 | $364 | Implemented |
UD0626 # 06 Y:2001 | 06 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,158 | $1,050 | Implemented |
UD0626 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,847 | $42 | Implemented |
UD0626 # 08 Y:2001 | 08 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,587 | $423 | Implemented |
UD0626 # 09 Y:2001 | 09 | 2001 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $860 | $250 | Implemented |
UD0626 # 10 Y:2001 | 10 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $580 | $2,526 | Implemented |
MA0488 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $84,500 | $1,500 | Implemented |
MA0488 # 03 Y:2001 | 03 | 2001 | MINIMIZE WATER USAGE | $25,000 | $0 | Implemented |
MA0488 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,025 | $700 | Implemented |
MA0488 # 07 Y:2001 | 07 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,800 | $0 | Implemented |
MA0488 # 08 Y:2001 | 08 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,000 | $12,000 | Implemented |
MA0488 # 09 Y:2001 | 09 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,900 | $8,000 | Implemented |
MA0488 # 10 Y:2001 | 10 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,700 | $7,500 | Implemented |
MA0488 # 14 Y:2001 | 14 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $200 | $150 | Implemented |
AS0300 # 02 Y:2001 | 02 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,174 | $300 | Implemented |