Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,654
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0248 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,837 | $14,800 | Implemented |
SD0248 # 03 Y:2000 | 03 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,532 | $7,536 | Implemented |
SD0248 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,585 | $0 | Implemented |
SD0248 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,887 | $4,950 | Implemented |
SD0248 # 07 Y:2000 | 07 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $11,600 | $1,000 | Implemented |
SD0248 # 09 Y:2000 | 09 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,397 | $8,500 | Implemented |
SD0248 # 11 Y:2000 | 11 | 2000 | INSTALL SYSTEM TO COLLECT SCRAP | $13,426 | $11,836 | Implemented |
TN0685 # 02 Y:2000 | 02 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $49,590 | $3,000 | Implemented |
TN0685 # 03 Y:2000 | 03 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,596 | $0 | Implemented |
TN0685 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,083 | $805 | Implemented |
IA0241 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,172 | $1,104 | Implemented |
IA0241 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,055 | $0 | Implemented |
IA0241 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,325 | $39,789 | Implemented |
UD0594 # 03 Y:2000 | 03 | 2000 | USE PHOTOCELL CONTROLS | $342 | $0 | Implemented |
MA0464 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $193 | $0 | Implemented |
MA0464 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $145 | $440 | Implemented |
MA0462 # 04 Y:2000 | 04 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,632 | $31,000 | Implemented |
MA0462 # 05 Y:2000 | 05 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $13,500 | $6,000 | Implemented |
MA0462 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,580 | $17,000 | Implemented |
MA0462 # 07 Y:2000 | 07 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,757 | $1,200 | Implemented |
MA0462 # 09 Y:2000 | 09 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,406 | $1,200 | Implemented |
MA0462 # 10 Y:2000 | 10 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $614 | $3,575 | Implemented |
MA0461 # 01 Y:2000 | 01 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $15,869 | $768 | Implemented |
MA0461 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,834 | $18,630 | Implemented |
MA0461 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,838 | $30,000 | Implemented |