Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
82
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0041 # 05 Y:1992 | 05 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $81 | $188 | Implemented |
IA0041 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,582 | $1,106 | Implemented |
IA0041 # 02 Y:1992 | 02 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $8,582 | $3,000 | Implemented |
IA0041 # 01 Y:1992 | 01 | 1992 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $20,185 | $81,000 | Implemented |
AM0165 # 01 Y:1992 | 01 | 1992 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $23,570 | $1,350 | Implemented |
AM0165 # 02 Y:1992 | 02 | 1992 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $6,300 | $3,630 | Implemented |
AM0165 # 08 Y:1992 | 08 | 1992 | INSTALL SET-BACK TIMERS | $150 | $190 | Implemented |
AM0165 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,330 | $2,520 | Implemented |
KU0383 # 02 Y:1992 | 02 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,849 | $0 | Implemented |
KU0383 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,816 | $2,607 | Implemented |
KU0383 # 04 Y:1992 | 04 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $275 | $80 | Implemented |
KU0383 # 09 Y:1992 | 09 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $412 | $200 | Implemented |
UD0379 # 03 Y:1992 | 03 | 1992 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $3,637 | $750 | Implemented |
UD0379 # 02 Y:1992 | 02 | 1992 | INSULATE BARE EQUIPMENT | $8,593 | $9,000 | Implemented |
HO0025 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $330 | $320 | Implemented |
HO0025 # 03 Y:1992 | 03 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,322 | $800 | Implemented |
HO0025 # 02 Y:1992 | 02 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,071 | $1,072 | Implemented |
IA0031 # 01 Y:1992 | 01 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $22,249 | $1,500 | Implemented |
IA0029 # 07 Y:1992 | 07 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,217 | $331 | Implemented |
IA0029 # 06 Y:1992 | 06 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,079 | $100 | Implemented |
IA0029 # 01 Y:1992 | 01 | 1992 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $83,615 | $95,000 | Implemented |
KU0381 # 04 Y:1992 | 04 | 1992 | INSTALL SET-BACK TIMERS | $751 | $700 | Implemented |
KU0381 # 01 Y:1992 | 01 | 1992 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,545 | $20 | Implemented |
KU0381 # 07 Y:1992 | 07 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $450 | $716 | Implemented |
KU0381 # 09 Y:1992 | 09 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $429 | $1,400 | Implemented |