IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

512

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0237 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,874 $0 Implemented
SF0237 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $4,283 $960 Not Implemented
SF0237 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,539 $1,024 Implemented
SF0237 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $8,315 $6,667 Implemented
SF0237 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,732 $16,065 Not Implemented
SF0237 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,405 $58,318 Implemented
SF0237 # 08 Y:2002 08 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $210 $627 Not Implemented
SF0237 # 09 Y:2002 09 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,489 $0 Implemented
SF0237 # 10 Y:2002 10 2002 OPTIMIZE PLANT POWER FACTOR $4,500 $5,806 Not Implemented
WI0422 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $107,793 $715,000 Not Implemented
WI0422 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $51,405 $31,028 Not Implemented
WI0422 # 03 Y:2002 03 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $37,726 $40,000 Not Implemented
WI0422 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,645 $21,689 Implemented
WI0422 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $0 Not Implemented
NC0235 # 01 Y:2002 01 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,277 $100 Implemented
NC0235 # 02 Y:2002 02 2002 $156,500 $1,000 Not Implemented
NC0235 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,464 $550 Not Implemented
NC0235 # 04 Y:2002 04 2002 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $30,410 $1,000 Implemented
NC0235 # 05 Y:2002 05 2002 DEVELOP A REPAIR/REPLACE POLICY $23,267 $15,570 Implemented
NC0235 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $2,434 Implemented
NC0235 # 07 Y:2002 07 2002 RECOVER AND REUSE COOLING WATER $213 $500 Not Implemented
IC0036 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,908 $13,275 Not Implemented
IC0036 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,335 $22,479 Not Implemented
IC0036 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,457 $2,900 Implemented
IC0036 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,201 $53,875 Implemented