Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
382
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0199 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,830 | $0 | Not Implemented |
SU0199 # 03 Y:2005 | 03 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $371,280 | $13,500 | Implemented |
SU0199 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,792 | $1,184 | Not Implemented |
SU0199 # 05 Y:2005 | 05 | 2005 | USE SYNTHETIC LUBRICANT | $7,434 | $2,000 | Implemented |
MA0559 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $239,059 | $699,000 | Not Implemented |
MA0559 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $70,580 | $123,500 | Not Implemented |
MA0559 # 03 Y:2004 | 03 | 2004 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $36,905 | $15,475 | Implemented |
MA0559 # 04 Y:2004 | 04 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,513 | $4,078 | Not Implemented |
MA0559 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,349 | $11,346 | Implemented |
MA0559 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,861 | $14,400 | Not Implemented |
MA0559 # 07 Y:2004 | 07 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,383 | $333 | Not Implemented |
SU0189 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,275 | $0 | Not Implemented |
SU0189 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,940 | $0 | Implemented |
SU0189 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,291 | $378 | Implemented |
SU0189 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,591 | $1,175 | Implemented |
SU0189 # 05 Y:2004 | 05 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $49,312 | $60,000 | Implemented |
SU0189 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,510 | $45,708 | Not Implemented |
SU0152 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,627 | $14,850 | n/a |
SU0152 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,105 | $110 | n/a |
SU0152 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,683 | $10,300 | n/a |
SU0152 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,043 | $16,500 | n/a |
SU0152 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,217 | $160 | n/a |
SU0152 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,659 | $270 | n/a |
SU0152 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,192 | $103 | n/a |
SU0146 # 01 Y:2002 | 01 | 2002 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $18,266 | $35,000 | Not Implemented |