IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,948

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0318 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $203 $532 Not Implemented
IA0318 # 08 Y:2003 08 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $43,920 $320 Not Implemented
MA0533 # 01 Y:2003 01 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,237 $1,300 Not Implemented
MA0533 # 02 Y:2003 02 2003 REDUCE VENTILATION AIR $16,298 $34,450 Not Implemented
MA0533 # 03 Y:2003 03 2003 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $10,803 $25,625 Implemented
MA0533 # 04 Y:2003 04 2003 ADD AREA LIGHTING SWITCHES $8,645 $3,215 Implemented
MA0533 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $5,140 $15,455 Implemented
MA0533 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,624 $6,120 Implemented
MA0533 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,098 $1,090 Implemented
UF0320 # 01 Y:2003 01 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $25,707 $48,985 Implemented
UF0320 # 02 Y:2003 02 2003 INSTALL SKYLIGHTS $16,155 $67,591 Not Implemented
UF0320 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,161 $225 Implemented
UF0320 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $3,320 $3,000 Not Implemented
UF0320 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,604 $0 Not Implemented
UF0320 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,426 $28,971 Not Implemented
UF0320 # 07 Y:2003 07 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $70,120 $150,000 Not Implemented
UF0320 # 08 Y:2003 08 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $7,009 $4,000 Implemented
UF0320 # 09 Y:2003 09 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $448,198 $37,200 Implemented
LM0059 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $634 $310 Not Implemented
LM0059 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $298 $120 Implemented
LM0059 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $402 $150 Not Implemented
LM0059 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $245 $145 Not Implemented
LM0059 # 05 Y:2003 05 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,308 $5,000 Not Implemented
LM0059 # 06 Y:2003 06 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,238 $11,000 Not Implemented
LM0059 # 07 Y:2003 07 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,160,984 $1,000,000 Not Implemented