Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,948
matching recommendationsSIC | 26 | Paper And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0318 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $203 | $532 | Not Implemented |
IA0318 # 08 Y:2003 | 08 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $43,920 | $320 | Not Implemented |
MA0533 # 01 Y:2003 | 01 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $27,237 | $1,300 | Not Implemented |
MA0533 # 02 Y:2003 | 02 | 2003 | REDUCE VENTILATION AIR | $16,298 | $34,450 | Not Implemented |
MA0533 # 03 Y:2003 | 03 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $10,803 | $25,625 | Implemented |
MA0533 # 04 Y:2003 | 04 | 2003 | ADD AREA LIGHTING SWITCHES | $8,645 | $3,215 | Implemented |
MA0533 # 05 Y:2003 | 05 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,140 | $15,455 | Implemented |
MA0533 # 06 Y:2003 | 06 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,624 | $6,120 | Implemented |
MA0533 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,098 | $1,090 | Implemented |
UF0320 # 01 Y:2003 | 01 | 2003 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $25,707 | $48,985 | Implemented |
UF0320 # 02 Y:2003 | 02 | 2003 | INSTALL SKYLIGHTS | $16,155 | $67,591 | Not Implemented |
UF0320 # 03 Y:2003 | 03 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,161 | $225 | Implemented |
UF0320 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $3,320 | $3,000 | Not Implemented |
UF0320 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,604 | $0 | Not Implemented |
UF0320 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,426 | $28,971 | Not Implemented |
UF0320 # 07 Y:2003 | 07 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $70,120 | $150,000 | Not Implemented |
UF0320 # 08 Y:2003 | 08 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $7,009 | $4,000 | Implemented |
UF0320 # 09 Y:2003 | 09 | 2003 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $448,198 | $37,200 | Implemented |
LM0059 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $634 | $310 | Not Implemented |
LM0059 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $298 | $120 | Implemented |
LM0059 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $402 | $150 | Not Implemented |
LM0059 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $245 | $145 | Not Implemented |
LM0059 # 05 Y:2003 | 05 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,308 | $5,000 | Not Implemented |
LM0059 # 06 Y:2003 | 06 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,238 | $11,000 | Not Implemented |
LM0059 # 07 Y:2003 | 07 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,160,984 | $1,000,000 | Not Implemented |