IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,067

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0623 # 06 Y:1998 06 1998 DISCONNECT BALLASTS $13,255 $900 Not Implemented
TN0623 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $9,920 $16,200 Not Implemented
TN0623 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $1,980 $380 Not Implemented
TN0623 # 09 Y:1998 09 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,230 $0 Not Implemented
HO0165 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,288 $8,266 Implemented
HO0165 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $171 $510 Implemented
HO0165 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $949 $800 Not Implemented
HO0165 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,280 $6,500 Not Implemented
HO0165 # 05 Y:1998 05 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,900 $1,920 Not Implemented
OD0099 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,007 $11,490 Implemented
OD0099 # 02 Y:1997 02 1997 OPERATE BOILERS ON HIGH FIRE SETTING $1,495 $1,495 Implemented
OD0099 # 03 Y:1997 03 1997 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $19,847 $8,500 Not Implemented
NC0130 # 03 Y:1997 03 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,610 $2,650 Not Implemented
NC0130 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,182 $1,400 Not Implemented
NC0130 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $759 $700 Not Implemented
NC0130 # 06 Y:1997 06 1997 REPAIR AND ELIMINATE STEAM LEAKS $72,505 $200 Not Implemented
NC0130 # 07 Y:1997 07 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $9,082 $5,200 Not Implemented
NC0130 # 08 Y:1997 08 1997 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $22,291 $28,000 Not Implemented
NC0130 # 09 Y:1997 09 1997 RECOVER AND REUSE COOLING WATER $109,838 $30,250 Not Implemented
NC0130 # 10 Y:1997 10 1997 REDUCE EXCESSIVE BOILER BLOWDOWN $1,000 $0 Not Implemented
NC0130 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $513 $448 Not Implemented
NC0130 # 02 Y:1997 02 1997 DISCONNECT BALLASTS $474 $750 Not Implemented
MO0218 # 01 Y:1997 01 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $10,045 $3,500 Implemented
MO0218 # 02 Y:1997 02 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $6,750 $12,500 Not Implemented
MO0218 # 03 Y:1997 03 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $6,400 $15,000 Implemented