IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2430 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,137 $60 n/a
KS2430 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,174 $9,216 n/a
KS2430 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $4,172 $5,121 n/a
KS2430 # 05 Y:2024 05 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,954 $60,601 n/a
KS2430 # 06 Y:2024 06 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $93,352 $684,000 n/a
KS2430 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $53,570 $460,976 n/a
NC0349 # 07 Y:2006 07 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,246 $5,000 Not Implemented
NC0349 # 08 Y:2006 08 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,891 $4,000 Not Implemented
NC0349 # 05 Y:2006 05 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $19,058 $28,785 Not Implemented
NC0349 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,087 $4,340 Not Implemented
NC0349 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $18,045 $2,000 Not Implemented
NC0349 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $3,668 $1,000 Not Implemented
NC0349 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $2,375 $1,000 Not Implemented
NC0349 # 02 Y:2006 02 2006 REDUCE EXCESS STEAM BLEEDING $23,110 $13,525 Not Implemented
NC0289 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,527 $0 Not Implemented
NC0289 # 01 Y:2004 01 2004 RECYCLE WASTE INK AND CLEANUP SOLVENT $21,873 $25,000 Implemented
NC0289 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $230 $154 Not Implemented
NC0289 # 04 Y:2004 04 2004 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $972 $1,000 Not Implemented
NC0256 # 05 Y:2003 05 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,851 $30,000 Not Implemented
NC0256 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $2,112 $4,375 Implemented
NC0256 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $123 $200 Implemented
NC0256 # 08 Y:2003 08 2003 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,260 $28,000 Implemented
NC0256 # 09 Y:2003 09 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $60,400 $20,000 Implemented
NC0256 # 10 Y:2003 10 2003 MODIFY CURRENT INCENTIVE PROGRAM $190,000 $14,000 Not Implemented
NC0256 # 02 Y:2003 02 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $21,031 $45,000 Not Implemented