Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
364
matching recommendationsSIC | 262 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0961 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $4,776 | $4,480 | Implemented |
GT0961 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,116 | $800 | Implemented |
GT0961 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,590 | $25,886 | Implemented |
GT0961 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,851 | $900 | Implemented |
GT0961 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $58,279 | $1,850 | Implemented |
UW2211 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $2,186 | $1,771 | Implemented |
UW2211 # 01 Y:2022 | 01 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,539 | $5,669 | Implemented |
UW2211 # 02 Y:2022 | 02 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,053 | $286 | Implemented |
UW2211 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,126 | $6,616 | Implemented |
UW2211 # 04 Y:2022 | 04 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $708 | $760 | Implemented |
LE0524 # 11 Y:2022 | 11 | 2022 | REPLACE BOILER | $461,406 | $4,000,000 | Implemented |
LE0524 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,133 | $7,750 | Implemented |
LE0524 # 02 Y:2022 | 02 | 2022 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $131,350 | $40,000 | Implemented |
MA0819 # 02 Y:2020 | 02 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,022 | $217,000 | Implemented |
LS1917 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,652 | $49,919 | Implemented |
LS1917 # 01 Y:2019 | 01 | 2019 | PAY UTILITY BILLS ON TIME | $27,657 | $0 | Implemented |
LS1917 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,391 | $0 | Implemented |
AS0470 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,843 | $10,895 | Implemented |
AS0470 # 04 Y:2019 | 04 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $12,345 | $516 | Implemented |
AS0470 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,823 | $3,204 | Implemented |
AS0470 # 02 Y:2019 | 02 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $19,947 | $40,400 | Implemented |
AS0470 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $680,774 | $3,152,400 | Implemented |
AS0467 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,014 | $200 | Implemented |
AS0467 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,754 | $16,690 | Implemented |
AS0467 # 01 Y:2019 | 01 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $47,588 | $48,177 | Implemented |