IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 262 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0727 # 03 Y:2014 03 2014 PAY UTILITY BILLS ON TIME $6,481 $500 Implemented
MA0727 # 05 Y:2014 05 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,122 $1,500 Implemented
MA0725 # 01 Y:2014 01 2014 BURN A LESS EXPENSIVE GRADE OF FUEL $1,049,475 $2,750,000 Implemented
MA0725 # 05 Y:2014 05 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $28,833 $9,690 Implemented
MA0725 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,314 $10,600 Implemented
MA0725 # 06 Y:2014 06 2014 UPGRADE CONTROLS ON COMPRESSORS $23,788 $9,000 Implemented
MA0725 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,977 $12,270 Implemented
MA0725 # 12 Y:2014 12 2014 INSULATE BARE EQUIPMENT $3,366 $30,760 Implemented
MA0642 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $251 $120 Implemented
MA0642 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,279 $27,924 Implemented
MA0566 # 02 Y:2004 02 2004 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $113,441 $191,180 Implemented
MA0566 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $148,951 $35,885 Implemented
MA0566 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $33,400 $20,000 Implemented
MA0566 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $5,889 $3,076 Implemented
MA0484 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,500 $9,500 Implemented
MA0484 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,300 $12,000 Implemented
MA0484 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,800 $51,800 Implemented
MA0484 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,700 $0 Implemented
MA0484 # 09 Y:2001 09 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,200 $0 Implemented
MA0484 # 10 Y:2001 10 2001 INSULATE FEEDWATER TANK $2,000 $3,000 Implemented
MA0435 # 03 Y:1999 03 1999 DIRECT WARMEST AIR TO COMBUSTION INTAKE $313 $472 Implemented
MA0435 # 04 Y:1999 04 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $521 $294 Implemented
MA0435 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $590 $248 Implemented
MA0264 # 02 Y:1993 02 1993 INSTALL OCCUPANCY SENSORS $3,896 $1,274 Implemented
MA0264 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,443 $1,176 Implemented