IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

742

matching recommendations
Reset
SIC 2621 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0059 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $402 $150 Not Implemented
LM0059 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $245 $145 Not Implemented
LM0059 # 05 Y:2003 05 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,308 $5,000 Not Implemented
LM0059 # 06 Y:2003 06 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,238 $11,000 Not Implemented
LM0059 # 07 Y:2003 07 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,160,984 $1,000,000 Not Implemented
LM0059 # 08 Y:2003 08 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $17,902 $10,000 Implemented
LM0059 # 09 Y:2003 09 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,518,000 $250,000 Not Implemented
SU0140 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $593,735 $5,128,500 Not Implemented
SU0140 # 02 Y:2002 02 2002 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $392,475 $730,000 Not Implemented
SU0140 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $147,968 $19,500 Not Implemented
SU0140 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,283 $64,018 Implemented
SU0140 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,631 $14,250 Implemented
SU0140 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,122 $700 Implemented
SU0140 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,142 $360 Not Implemented
SU0140 # 08 Y:2002 08 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $3,151 $8,733 Implemented
SU0140 # 09 Y:2002 09 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,480 $0 Implemented
SU0140 # 10 Y:2002 10 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $931 $581 Not Implemented
MA0518 # 01 Y:2002 01 2002 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $27,840 $56,000 Not Implemented
MA0518 # 02 Y:2002 02 2002 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $26,093 $28,000 Not Implemented
MA0518 # 03 Y:2002 03 2002 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $7,380 $34,000 Not Implemented
MA0518 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,756 $4,000 Implemented
MA0518 # 05 Y:2002 05 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,648 $1,250 Implemented
MA0518 # 06 Y:2002 06 2002 INSULATE FEEDWATER TANK $847 $1,000 Implemented
MS0201 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,647 $9,315 Not Implemented
MS0201 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75,640 $145,111 Not Implemented