Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 2621 | Paper Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0567 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,633 | $54,474 | Not Implemented |
MA0567 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,220 | $11,950 | Not Implemented |
MA0567 # 04 Y:2004 | 04 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $8,762 | $1,000 | Implemented |
MA0567 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $4,156 | $6,867 | Implemented |
MA0567 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,942 | $5,000 | Not Implemented |
MA0567 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $1,615 | $1,369 | Implemented |
MA0567 # 01 Y:2004 | 01 | 2004 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $70,900 | $270,000 | Implemented |
MA0566 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $148,951 | $35,885 | Implemented |
MA0566 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,306 | $16,750 | Not Implemented |
MA0566 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $33,400 | $20,000 | Implemented |
MA0566 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $69,926 | $70,000 | Not Implemented |
MA0566 # 03 Y:2004 | 03 | 2004 | USE MINIMUM STEAM OPERATING PRESSURE | $75,183 | $1,350 | Not Implemented |
MA0566 # 02 Y:2004 | 02 | 2004 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $113,441 | $191,180 | Implemented |
MA0566 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $5,889 | $3,076 | Implemented |
UM0271 # 07 Y:2004 | 07 | 2004 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,064 | $1,921 | Not Implemented |
UM0271 # 04 Y:2004 | 04 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $24,731 | $30,000 | Not Implemented |
UM0271 # 01 Y:2004 | 01 | 2004 | BURN A LESS EXPENSIVE GRADE OF FUEL | $542,255 | $2,000,000 | Not Implemented |
UM0271 # 03 Y:2004 | 03 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $46,000 | $46,000 | Not Implemented |
UM0271 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,485 | $27,143 | Not Implemented |
UM0271 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,777 | $975 | Not Implemented |
UM0271 # 02 Y:2004 | 02 | 2004 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $145,057 | $125,000 | Not Implemented |
UM0271 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $1,412 | $828 | Not Implemented |
MA0559 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,349 | $11,346 | Implemented |
MA0559 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,861 | $14,400 | Not Implemented |
MA0559 # 07 Y:2004 | 07 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,383 | $333 | Not Implemented |