IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

393

matching recommendations
Reset
SIC 263 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0510 # 04 Y:2002 04 2002 REDUCE FLUID FLOW RATES $1,849 $0 Implemented
MA0510 # 05 Y:2002 05 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,619 $0 Implemented
MA0510 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,604 $1,792 Implemented
MA0510 # 07 Y:2002 07 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,382 $0 Implemented
MA0510 # 08 Y:2002 08 2002 USE MINIMUM STEAM OPERATING PRESSURE $960 $0 Implemented
MA0510 # 09 Y:2002 09 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $750 $0 Implemented
WI0422 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $107,793 $715,000 Not Implemented
WI0422 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $51,405 $31,028 Not Implemented
WI0422 # 03 Y:2002 03 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $37,726 $40,000 Not Implemented
WI0422 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,645 $21,689 Implemented
WI0422 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $0 Not Implemented
IA0274 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,203 $515 Implemented
IA0274 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,244 $228 Implemented
IA0274 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,272 $50 Implemented
IA0274 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,018 $6,398 Implemented
IA0274 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $0 Implemented
IA0274 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $1,126 $1,530 Implemented
IA0274 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $348,370 $28,600 Not Implemented
IA0274 # 08 Y:2001 08 2001 REPAIR AND ELIMINATE STEAM LEAKS $20,113 $2,400 Implemented
IA0274 # 09 Y:2001 09 2001 REPAIR AND ELIMINATE STEAM LEAKS $11,081 $1,060 Implemented
IA0274 # 10 Y:2001 10 2001 DIRECT WARMEST AIR TO COMBUSTION INTAKE $31,235 $6,000 Implemented
IA0274 # 11 Y:2001 11 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,235 $5,000 Implemented
BD0162 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,293 $14,000 Not Implemented
BD0162 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $709 $800 Not Implemented
BD0162 # 03 Y:2000 03 2000 REPAIR AND ELIMINATE STEAM LEAKS $270 $150 Implemented