IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

380

matching recommendations
Reset
SIC 2631 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0162 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,650 $0 Not Implemented
LE0162 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,998 $0 Not Implemented
MA0525 # 01 Y:2002 01 2002 AIR CONDITION ONLY SPACE NECESSARY $10,201 $800 Implemented
MA0525 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,687 $5,159 Not Implemented
MA0525 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $791 $0 Implemented
MA0525 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $582 $200 Implemented
MA0525 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $425 $596 Implemented
MA0525 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $101 $0 Implemented
MA0525 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $80 $300 Not Implemented
MA0510 # 01 Y:2002 01 2002 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $16,518 $13,775 n/a
MA0510 # 02 Y:2002 02 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,976 $7,800 Not Implemented
MA0510 # 03 Y:2002 03 2002 COMBINE UTILITY METERS $2,200 $6,470 Not Implemented
MA0510 # 04 Y:2002 04 2002 REDUCE FLUID FLOW RATES $1,849 $0 Implemented
MA0510 # 05 Y:2002 05 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,619 $0 Implemented
MA0510 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,604 $1,792 Implemented
MA0510 # 07 Y:2002 07 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,382 $0 Implemented
MA0510 # 08 Y:2002 08 2002 USE MINIMUM STEAM OPERATING PRESSURE $960 $0 Implemented
MA0510 # 09 Y:2002 09 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $750 $0 Implemented
WI0422 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $0 Not Implemented
WI0422 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,645 $21,689 Implemented
WI0422 # 03 Y:2002 03 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $37,726 $40,000 Not Implemented
WI0422 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $51,405 $31,028 Not Implemented
WI0422 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $107,793 $715,000 Not Implemented
IA0274 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,203 $515 Implemented
IA0274 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,244 $228 Implemented