IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

375

matching recommendations
Reset
SIC 2631 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0276 # 01 Y:2005 01 2005 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $206,100 $96,000 Implemented
UM0276 # 03 Y:2005 03 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $663,486 $7,500,000 Not Implemented
UM0276 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,572 $2,500 Implemented
NC0301 # 01 Y:2004 01 2004 $39,250 $10,000 Not Implemented
NC0301 # 02 Y:2004 02 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $32,270 $2,500 Not Implemented
NC0301 # 03 Y:2004 03 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,891 $17,930 Not Implemented
NC0301 # 04 Y:2004 04 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $17,538 $27,880 Not Implemented
NC0301 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,961 $3,154 Not Implemented
NC0301 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $812 $100 Not Implemented
MI0060 # 01 Y:2003 01 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,444 $513 Implemented
MI0060 # 02 Y:2003 02 2003 REPAIR OR REPLACE STEAM TRAPS $1,282 $57 Implemented
MI0060 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $49,692 $22,500 Not Implemented
MI0060 # 04 Y:2003 04 2003 REDUCE EXCESSIVE BOILER BLOWDOWN $6,768 $4,500 Not Implemented
MI0060 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $943 $1,792 Not Implemented
MI0060 # 06 Y:2003 06 2003 METER WASTE WATER $36,908 $1,950 Implemented
MI0060 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $971 $258 Implemented
LE0162 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $32,370 $30,000 Not Implemented
LE0162 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,998 $0 Not Implemented
LE0162 # 03 Y:2003 03 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $75,310 $1,300 Not Implemented
LE0162 # 04 Y:2003 04 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $45,089 $9,024 Not Implemented
LE0162 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,650 $0 Not Implemented
LE0162 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,998 $0 Not Implemented
MA0525 # 01 Y:2002 01 2002 AIR CONDITION ONLY SPACE NECESSARY $10,201 $800 Implemented
MA0525 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,687 $5,159 Not Implemented
MA0525 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $791 $0 Implemented