IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

380

matching recommendations
Reset
SIC 2631 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0495 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,320 $360 Implemented
WI0495 # 09 Y:2005 09 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $242 $200 Implemented
WI0495 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $322 $150 Not Implemented
WI0495 # 07 Y:2005 07 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,135 $1,500 Implemented
WI0495 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,800 $1,280 Not Implemented
UM0276 # 01 Y:2005 01 2005 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $206,100 $96,000 Implemented
UM0276 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,572 $2,500 Implemented
UM0276 # 03 Y:2005 03 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $663,486 $7,500,000 Not Implemented
NC0301 # 01 Y:2004 01 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $39,250 $10,000 Not Implemented
NC0301 # 02 Y:2004 02 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $32,270 $2,500 Not Implemented
NC0301 # 03 Y:2004 03 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,891 $17,930 Not Implemented
NC0301 # 04 Y:2004 04 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $17,538 $27,880 Not Implemented
NC0301 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,961 $3,154 Not Implemented
NC0301 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $812 $100 Not Implemented
MI0060 # 01 Y:2003 01 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,444 $513 Implemented
MI0060 # 02 Y:2003 02 2003 REPAIR OR REPLACE STEAM TRAPS $1,282 $57 Implemented
MI0060 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $49,692 $22,500 Not Implemented
MI0060 # 04 Y:2003 04 2003 REDUCE EXCESSIVE BOILER BLOWDOWN $6,768 $4,500 Not Implemented
MI0060 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $943 $1,792 Not Implemented
MI0060 # 06 Y:2003 06 2003 METER WASTE WATER $36,908 $1,950 Implemented
MI0060 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $971 $258 Implemented
LE0162 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $32,370 $30,000 Not Implemented
LE0162 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,998 $0 Not Implemented
LE0162 # 03 Y:2003 03 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $75,310 $1,300 Not Implemented
LE0162 # 04 Y:2003 04 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $45,089 $9,024 Not Implemented