Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,617
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0308 # 07 Y:2005 | 07 | 2005 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $867 | $750 | Implemented |
NC0308 # 08 Y:2005 | 08 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $338 | $160 | Implemented |
LE0195 # 04 Y:2004 | 04 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $19,946 | $48,000 | Implemented |
LE0195 # 05 Y:2004 | 05 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $16,168 | $6,683 | Implemented |
LE0195 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,095 | $0 | Implemented |
LE0195 # 08 Y:2004 | 08 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,089 | $0 | Implemented |
LE0195 # 10 Y:2004 | 10 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,299 | $1,200 | Implemented |
LE0195 # 11 Y:2004 | 11 | 2004 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $960 | $200 | Implemented |
MA0556 # 02 Y:2004 | 02 | 2004 | OPTIMIZE PLANT POWER FACTOR | $13,042 | $6,750 | Implemented |
MA0556 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,720 | $10,350 | Implemented |
MA0556 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,840 | $2,131 | Implemented |
MA0556 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,167 | $10,200 | Implemented |
MA0556 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,534 | $529 | Implemented |
UM0259 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $20,415 | $11,200 | Implemented |
UM0259 # 04 Y:2004 | 04 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $12,337 | $7,410 | Implemented |
UM0259 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,545 | $75,000 | Implemented |
UM0259 # 07 Y:2004 | 07 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,423 | $1,500 | Implemented |
UM0259 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,205 | $825 | Implemented |
UM0259 # 09 Y:2004 | 09 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $1,893 | $68 | Implemented |
UM0259 # 10 Y:2004 | 10 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,765 | $200 | Implemented |
UM0259 # 11 Y:2004 | 11 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,700 | $1,100 | Implemented |
UU0062 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,404 | $790 | Implemented |
SU0189 # 02 Y:2004 | 02 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,940 | $0 | Implemented |
SU0189 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,291 | $378 | Implemented |
SU0189 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,591 | $1,175 | Implemented |