IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,617

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0275 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $455 $683 Implemented
TA0064 # 01 Y:2003 01 2003 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $9,350 $1,800 Implemented
TA0064 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,770 $0 Implemented
TA0064 # 05 Y:2003 05 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,740 $520 Implemented
TA0064 # 07 Y:2003 07 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $101 $211 Implemented
TA0063 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $270 Implemented
TA0063 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,730 $17 Implemented
TA0063 # 04 Y:2003 04 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $18,000 $11,210 Implemented
TA0063 # 01 Y:2003 01 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $27,915 $0 Implemented
NC0266 # 02 Y:2003 02 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,628 $4,597 Implemented
NC0266 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,941 $2,157 Implemented
NC0266 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $300 Implemented
NC0266 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,833 $1,189 Implemented
NC0266 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $61 $132 Implemented
NC0266 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $744 $1,456 Implemented
UM0240 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $28,120 $1,000 Implemented
UM0240 # 02 Y:2003 02 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $17,060 $5,000 Implemented
UM0240 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,440 $2,500 Implemented
UM0240 # 05 Y:2003 05 2003 UPGRADE CONTROLS ON COMPRESSORS $14,410 $5,000 Implemented
UM0240 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,305 $500 Implemented
UM0240 # 09 Y:2003 09 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,550 $1,100 Implemented
WI0448 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,587 $13,005 Implemented
WI0448 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $610 $300 Implemented
MI0061 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $974 $332 Implemented
MI0061 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,962 $6 Implemented