Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,617
matching recommendationsSIC | 265 | Paperboard Containers And Boxes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AR0114 # 12 Y:1997 | 12 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $72,000 | $67,500 | Implemented |
AS0202 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,012 | $11,499 | Implemented |
AS0202 # 03 Y:1997 | 03 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,839 | $12 | Implemented |
AS0202 # 05 Y:1997 | 05 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,182 | $3,000 | Implemented |
AS0202 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,084 | $9,599 | Implemented |
AS0202 # 09 Y:1997 | 09 | 1997 | CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT | $665 | $0 | Implemented |
AS0202 # 10 Y:1997 | 10 | 1997 | TREAT AND REUSE RINSE WATERS | $940 | $500 | Implemented |
ME0209 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,912 | $32,046 | Implemented |
ME0209 # 04 Y:1997 | 04 | 1997 | INSULATE BARE EQUIPMENT | $5,853 | $925 | Implemented |
ME0209 # 06 Y:1997 | 06 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,024 | $0 | Implemented |
ME0209 # 09 Y:1997 | 09 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $432 | $91 | Implemented |
ME0209 # 10 Y:1997 | 10 | 1997 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $36,223 | $200,000 | Implemented |
AM0293 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,800 | $1,000 | Implemented |
AM0293 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,570 | $150 | Implemented |
AM0293 # 07 Y:1997 | 07 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $940 | $150 | Implemented |
AM0293 # 09 Y:1997 | 09 | 1997 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $745 | $1,490 | Implemented |
DS0080 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,720 | $12,717 | Implemented |
DS0080 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $453 | $3,281 | Implemented |
DS0080 # 05 Y:1997 | 05 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $8,150 | $1,100 | Implemented |
AM0291 # 01 Y:1997 | 01 | 1997 | RECOVER AND REUSE COOLING WATER | $7,000 | $4,100 | Implemented |
AM0291 # 02 Y:1997 | 02 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,100 | $5,630 | Implemented |
AM0291 # 04 Y:1997 | 04 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,100 | $2,500 | Implemented |
AM0291 # 05 Y:1997 | 05 | 1997 | REPAIR AND ELIMINATE STEAM LEAKS | $1,980 | $210 | Implemented |
AM0291 # 06 Y:1997 | 06 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,860 | $780 | Implemented |
AM0291 # 07 Y:1997 | 07 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,060 | $500 | Implemented |