IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,551

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0127 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $6,380 $4,526 Implemented
LL0127 # 04 Y:2002 04 2002 REPAIR AND ELIMINATE STEAM LEAKS $6,088 $900 Implemented
LL0127 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $1,970 $6,440 Implemented
GT0721 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $12,360 $5,050 n/a
GT0721 # 02 Y:2001 02 2001 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $25,375 $0 n/a
GT0721 # 03 Y:2001 03 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $38,845 $80,000 n/a
GT0721 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $705 $60 n/a
GT0721 # 05 Y:2001 05 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,530 $15,000 n/a
GT0721 # 06 Y:2001 06 2001 AUTOMATE FINISHING PROCESS $806,400 $3,500,000 n/a
CO0494 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,000 $12,000 Not Implemented
CO0494 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,820 $250 Implemented
CO0494 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,090 $800 Not Implemented
CO0494 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $80 $199 Implemented
CO0494 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $380 $0 Implemented
IA0283 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $878 $258 Implemented
IA0283 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $569 $34 Implemented
IA0283 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,046 $509 Implemented
IA0283 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $0 Not Implemented
IA0283 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,401 $12,898 Not Implemented
IA0283 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $543 $0 Implemented
IA0283 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $354 $17 Implemented
IA0283 # 08 Y:2001 08 2001 INSTALL TURBULATORS $982 $912 Implemented
IA0283 # 09 Y:2001 09 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $207,700 $60,000 Implemented
IA0283 # 10 Y:2001 10 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $409,465 $900,000 Not Implemented
IA0283 # 11 Y:2001 11 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $89,568 $135,000 Not Implemented