IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0114 # 07 Y:1997 07 1997 OPTIMIZE PLANT POWER FACTOR $21,464 $15,300 Implemented
AR0114 # 09 Y:1997 09 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,429 $0 Implemented
AR0114 # 10 Y:1997 10 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $677 $0 Implemented
AR0114 # 12 Y:1997 12 1997 $72,000 $67,500 Implemented
AS0202 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,839 $12 Implemented
AS0202 # 05 Y:1997 05 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,182 $3,000 Implemented
AS0202 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,084 $9,599 Implemented
AS0202 # 09 Y:1997 09 1997 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $665 $0 Implemented
AS0202 # 10 Y:1997 10 1997 TREAT AND REUSE RINSE WATERS $940 $500 Implemented
AR0114 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,809 $450 Implemented
AR0114 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,191 $290 Implemented
AR0114 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $226 $0 Implemented
AR0114 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,221 $2,950 Implemented
ME0209 # 09 Y:1997 09 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $432 $91 Implemented
ME0209 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,912 $32,046 Implemented
ME0209 # 04 Y:1997 04 1997 INSULATE BARE EQUIPMENT $5,853 $925 Implemented
ME0209 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,024 $0 Implemented
ME0209 # 10 Y:1997 10 1997 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $36,223 $200,000 Implemented
DS0080 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,720 $12,717 Implemented
DS0080 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $453 $3,281 Implemented
DS0080 # 05 Y:1997 05 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,150 $1,100 Implemented
AM0291 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $25 Implemented
AM0291 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,060 $500 Implemented
AM0291 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,860 $780 Implemented
AM0291 # 05 Y:1997 05 1997 REPAIR AND ELIMINATE STEAM LEAKS $1,980 $210 Implemented