IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 2657 Folding Paperboard Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0702 # 10 Y:2016 10 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $141 $350 Implemented
TA0108 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,530 $11,050 Implemented
TA0108 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $11,100 $22,000 Not Implemented
TA0108 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $120 Implemented
TA0108 # 05 Y:2005 05 2005 USE MINIMUM SAFE OVEN VENTILATION $300 $0 Not Implemented
TA0108 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,590 $0 Implemented
TA0108 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $2,910 $495 Implemented
TA0096 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,040 $500 Implemented
TA0096 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $175 $0 Not Implemented
TA0096 # 01 Y:2005 01 2005 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $13,200 $25,840 Not Implemented
TA0096 # 08 Y:2005 08 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $645 $0 Not Implemented
TA0096 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,525 $7,400 Not Implemented
TA0096 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $890 $0 Not Implemented
TA0096 # 04 Y:2005 04 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,870 $13,400 Not Implemented
TA0096 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $11,500 $2,340 Not Implemented
TA0096 # 02 Y:2005 02 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $12,700 $5,330 Not Implemented
AM0487 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $920 $500 Not Implemented
AM0487 # 01 Y:2005 01 2005 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $108,000 $24,500 Not Implemented
AM0487 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $27,000 $61,600 Not Implemented
AM0487 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,460 $500 Not Implemented
AM0487 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $10,400 $1,200 Not Implemented
AM0487 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $2,600 $100 Not Implemented
AM0487 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,700 $2,100 Not Implemented
AM0487 # 08 Y:2005 08 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,940 $4,200 Not Implemented
TA0063 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $22,400 $880 Not Implemented