IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0498 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,036 $11,640 Not Implemented
WI0498 # 04 Y:2005 04 2005 DISTILL CONTAMINATED SOLVENTS FOR REUSE $11,414 $21,105 Not Implemented
WI0498 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,079 $20,340 Not Implemented
WI0498 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,520 $17,500 Not Implemented
WI0498 # 01 Y:2005 01 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $0 $0 Not Implemented
WI0498 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $3,268 $0 Not Implemented
WI0497 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,421 $0 Implemented
WI0497 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,656 $500 Implemented
WI0497 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $42,415 $4,000 Not Implemented
WI0497 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,445 $86,400 Implemented
WI0497 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $60 Implemented
WI0497 # 01 Y:2005 01 2005 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $72,000 $85,000 Not Implemented
WI0494 # 01 Y:2005 01 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,360 $11,500 Not Implemented
WI0494 # 02 Y:2005 02 2005 DISTILL CONTAMINATED SOLVENTS FOR REUSE $12,456 $16,500 Not Implemented
WI0494 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,231 $12,960 Implemented
WI0494 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,060 $6,060 Not Implemented
WI0494 # 05 Y:2005 05 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,037 $1,000 Not Implemented
WI0494 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $207 $640 Not Implemented
WI0411 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $6,222 $9,800 Implemented
WI0411 # 01 Y:2002 01 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,331 $2,200 Implemented
WI0411 # 04 Y:2002 04 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $5,203 $0 Implemented
WI0411 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,921 $15,527 Implemented
WI0411 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,879 $1,996 Implemented
WI0411 # 06 Y:2002 06 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,308 $8,000 Implemented
WI0411 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,941 $740 Implemented