IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0465 # 09 Y:2012 09 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $2,179 $1,000 Implemented
NC0465 # 10 Y:2012 10 2012 INSULATE FEEDWATER TANK $464 $1,150 Implemented
NC0465 # 11 Y:2012 11 2012 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,007 $1,000 Implemented
NC0421 # 01 Y:2011 01 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $28,591 $51,300 Not Implemented
NC0421 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,751 $25,000 Not Implemented
NC0421 # 03 Y:2011 03 2011 REPAIR OR REPLACE STEAM TRAPS $12,484 $5,500 Implemented
NC0421 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,180 $25,000 Not Implemented
NC0421 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,844 $100 Implemented
NC0421 # 06 Y:2011 06 2011 DEVELOP A REPAIR/REPLACE POLICY $9,751 $20,768 Implemented
NC0390 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $46,662 $67,500 Not Implemented
NC0390 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $871 $100 Implemented
NC0390 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,075 $0 Not Implemented
NC0390 # 04 Y:2009 04 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,533 $50 Implemented
NC0390 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $432 Not Implemented
NC0390 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,223 $50,369 Not Implemented
NC0384 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $10,481 $5,000 Implemented
NC0384 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,352 $100 Implemented
NC0384 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,929 $7,700 Not Implemented
NC0384 # 04 Y:2008 04 2008 DEVELOP A REPAIR/REPLACE POLICY $1,428 $3,142 Not Implemented
NC0384 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,068 $271 Implemented
NC0384 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $5,000 Implemented
NC0384 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,112 $500 Implemented
NC0341 # 01 Y:2006 01 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,414 $25,000 Not Implemented
NC0341 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $9,082 $100 Not Implemented
NC0341 # 03 Y:2006 03 2006 DISCONNECT BALLASTS $1,454 $1,650 Not Implemented