Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,112
matching recommendationsSIC | 267 | Misc. Converted Paper Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0590 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,393 | $12,255 | Not Implemented |
MA0590 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,100 | $3,295 | Not Implemented |
MA0590 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,630 | $7,000 | Not Implemented |
MA0590 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,603 | $3,312 | Implemented |
MA0590 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,408 | $1,000 | Implemented |
MA0590 # 08 Y:2006 | 08 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $29,100 | $25,000 | Not Implemented |
MA0590 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $10,500 | $2,000 | Implemented |
MA0590 # 10 Y:2006 | 10 | 2006 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $9,818 | $6,420 | Implemented |
MA0590 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,286 | $21,300 | Not Implemented |
NC0322 # 01 Y:2005 | 01 | 2005 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $139,400 | $9,500 | Implemented |
NC0322 # 02 Y:2005 | 02 | 2005 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $8,353 | $2,650 | Implemented |
NC0322 # 03 Y:2005 | 03 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $74,009 | $100,000 | Not Implemented |
NC0322 # 04 Y:2005 | 04 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $573 | $0 | Implemented |
NC0322 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,592 | $821 | Implemented |
NC0322 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $462 | $100 | Implemented |
NC0322 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $723 | $298 | Implemented |
NC0322 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $217 | $2,000 | Implemented |
WI0498 # 01 Y:2005 | 01 | 2005 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $0 | $0 | Not Implemented |
WI0498 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,520 | $17,500 | Not Implemented |
WI0498 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,079 | $20,340 | Not Implemented |
WI0498 # 04 Y:2005 | 04 | 2005 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $11,414 | $21,105 | Not Implemented |
WI0498 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,036 | $11,640 | Not Implemented |
WI0498 # 06 Y:2005 | 06 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $3,268 | $0 | Not Implemented |
WI0498 # 07 Y:2005 | 07 | 2005 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,638 | $7,500 | Not Implemented |
WI0498 # 08 Y:2005 | 08 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,161 | $0 | Not Implemented |