IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0480 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $605 $2,300 Not Implemented
AS0480 # 04 Y:2020 04 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,442 $5,500 Not Implemented
AS0480 # 01 Y:2020 01 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,992 $66,000 Implemented
AS0480 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,276 $9,045 Not Implemented
AS0480 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,044 $9,363 Implemented
AS0455 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,551 $12,598 Implemented
AS0455 # 07 Y:2018 07 2018 PAY BILLS ON TIME TO AVOID LATE FEES $15,576 $0 Not Implemented
AS0455 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,097 $36,012 Implemented
AS0455 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,307 $180 Implemented
AS0455 # 05 Y:2018 05 2018 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $114,480 $30,000 Implemented
AS0455 # 06 Y:2018 06 2018 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,556 $0 Not Implemented
AS0455 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,768 $800 Not Implemented
AS0319 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,602 $3,885 Not Implemented
AS0319 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $110 $525 Not Implemented
AS0319 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,641 $7,690 Implemented
AS0319 # 04 Y:2002 04 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $288 $117 Not Implemented
AS0264 # 08 Y:1999 08 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $71,250 $300 Not Implemented
AS0264 # 07 Y:1999 07 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $63,000 $67,220 Not Implemented
AS0264 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $318 $60 Not Implemented
AS0264 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,077 $3,520 Not Implemented
AS0264 # 05 Y:1999 05 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,073 $120 Not Implemented
AS0264 # 04 Y:1999 04 1999 INSTALL TIMERS AND/OR THERMOSTATS $540 $750 Not Implemented
AS0264 # 06 Y:1999 06 1999 PAY BILLS ON TIME TO AVOID LATE FEES $390 $60 Not Implemented
AS0264 # 02 Y:1999 02 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,413 $5,527 Not Implemented
AS0241 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,409 $5,640 Not Implemented