IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0105 # 01 Y:2013 01 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,590 $1,500 Implemented
TT0100 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,700 $3,000 Implemented
TT0100 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $407 $150 Implemented
TT0100 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $4,500 Implemented
TT0100 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $360 Implemented
TT0100 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $3,000 Implemented
TT0093 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,350 $800 Implemented
TT0093 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,014 $7,685 Implemented
TT0093 # 03 Y:2012 03 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,625 $52,000 Implemented
MS0220 # 01 Y:2003 01 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $118,492 $100 Implemented
TN0623 # 03 Y:1998 03 1998 $77,680 $121,440 Implemented
TN0623 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $52,045 $61,760 Implemented
TN0623 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $30,000 $16,200 Implemented
AR0101 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,305 $350 Implemented
AR0101 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,857 $759 Implemented
AR0101 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,212 $1,048 Implemented
AR0101 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $817 $300 Implemented
AR0101 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $652 $70 Implemented
AR0101 # 08 Y:1996 08 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,526 $1,900 Implemented
AR0101 # 09 Y:1996 09 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,162 $0 Implemented
TN0305 # 06 Y:1987 06 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,034 $348 Implemented
TN0305 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $120 Implemented
TN0305 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,298 $210 Implemented
TN0305 # 01 Y:1987 01 1987 SHUT OFF PILOTS IN STANDBY EQUIPMENT $2,479 $0 Implemented
TN0191 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,027 $10,000 Implemented