IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
SIC 2671 Paper Coated & Laminated, Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0299 # 07 Y:2002 07 2002 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,388 $3,000 Implemented
LL0147 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,887 $1,500 Implemented
LL0147 # 03 Y:2002 03 2002 USE PHOTOCELL CONTROLS $2,355 $421 Implemented
IC0036 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,457 $2,900 Implemented
IC0036 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,201 $53,875 Implemented
IC0036 # 06 Y:2002 06 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $50,899 $6,720 Implemented
IC0036 # 08 Y:2002 08 2002 $54,800 $9,262 Implemented
UF0294 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $2,667 $654 Implemented
UF0294 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,905 $4,220 Implemented
UF0294 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,603 $14,749 Implemented
UF0294 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $651 $0 Implemented
UF0294 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,700 $7,000 Implemented
UF0294 # 10 Y:2002 10 2002 $8,320 $32,000 Implemented
LE0119 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,354 $1,920 Implemented
LE0119 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,434 $0 Implemented
LE0119 # 04 Y:2001 04 2001 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $19,921 $1,000 Implemented
LE0119 # 05 Y:2001 05 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $17,872 $18,500 Implemented
LL0112 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,154 $1,200 Implemented
LL0112 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $5,437 $9,810 Implemented
LL0112 # 05 Y:2001 05 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $353,891 $50,860 Implemented
WV0207 # 04 Y:2001 04 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,889 $2,760 Implemented
WV0207 # 05 Y:2001 05 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,319 $36 Implemented
WV0207 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $536 $108 Implemented
WV0207 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,825 $54 Implemented
WV0207 # 12 Y:2001 12 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $43,495 $2,000 Implemented