IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

175

matching recommendations
Reset
SIC 2672 Paper Coated And Laminated, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0331 # 09 Y:1998 09 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $710 $0 Implemented
AM0331 # 10 Y:1998 10 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $640 $0 Implemented
AM0331 # 11 Y:1998 11 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $475 $40 Implemented
AM0331 # 12 Y:1998 12 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $460 $0 Implemented
AM0331 # 13 Y:1998 13 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $180 $0 Implemented
TN0623 # 03 Y:1998 03 1998 $77,680 $121,440 Implemented
TN0623 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $52,045 $61,760 Implemented
TN0623 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $30,000 $16,200 Implemented
MA0396 # 02 Y:1997 02 1997 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $5,492 $11,700 Implemented
MA0396 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,606 $75 Implemented
MA0396 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,409 $60 Implemented
WI0230 # 02 Y:1995 02 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,633 $0 Implemented
WI0230 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $2,042 $2,089 Implemented
WI0230 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $442 $585 Implemented
WI0230 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,124 $500 Implemented
WI0230 # 07 Y:1995 07 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,098 $0 Implemented
MA0301 # 01 Y:1994 01 1994 REDUCE FLUID FLOW RATES $480,000 $657,000 Implemented
MA0301 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,256 $4,383 Implemented
MA0301 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,228 $0 Implemented
KU0375 # 01 Y:1992 01 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,449 $20,000 Implemented
KU0375 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,970 $525 Implemented
KU0375 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $621 $150 Implemented
KU0375 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $449 $229 Implemented
RU0075 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,281 $0 Implemented
MA0165 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,015 $840 Implemented