IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

401

matching recommendations
Reset
SIC 2672 Paper Coated And Laminated, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0376 # 01 Y:2010 01 2010 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $105,011 $51,500 Implemented
BD0376 # 02 Y:2010 02 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $67,200 $125 Not Implemented
BD0376 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $62,913 $70,000 Implemented
BD0376 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $989 $1,727 Implemented
NC0390 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $379 $432 Not Implemented
NC0390 # 01 Y:2009 01 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $46,662 $67,500 Not Implemented
NC0390 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $871 $100 Implemented
NC0390 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,075 $0 Not Implemented
NC0390 # 04 Y:2009 04 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,533 $50 Implemented
NC0390 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,223 $50,369 Not Implemented
LE0286 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,921 $25,494 Implemented
LE0286 # 08 Y:2009 08 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,174 $100 Implemented
LE0286 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,833 $350 Implemented
LE0286 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,998 $192 Implemented
LE0286 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,022 $800 Not Implemented
LE0286 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,170 $1,152 Not Implemented
LE0286 # 03 Y:2009 03 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,875 $10,000 Not Implemented
LE0286 # 02 Y:2009 02 2009 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $15,000 $40,000 Not Implemented
LE0286 # 01 Y:2009 01 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $20,166 $9,360 Not Implemented
DL0032 # 01 Y:2008 01 2008 REPLACE BOILER $30,400 $55,000 Not Implemented
DL0032 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $19,700 $1,200 Implemented
DL0032 # 03 Y:2008 03 2008 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $12,400 $7,000 Not Implemented
DL0032 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,639 $31,781 Implemented
DL0032 # 06 Y:2008 06 2008 REPLACE BOILER $6,100 $6,100 Implemented
DL0032 # 08 Y:2008 08 2008 USE MINIMUM STEAM OPERATING PRESSURE $2,065 $0 Implemented