IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

117

matching recommendations
Reset
SIC 2674 Bags: Uncoated Paper & Multiwall
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2004 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,227 $0 Implemented
LS2004 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,899 $0 Implemented
LS2004 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,617 $0 Implemented
SD0459 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,564 $2,200 Implemented
SD0459 # 05 Y:2012 05 2012 USE MINIMUM STEAM OPERATING PRESSURE $276 $200 Implemented
GT0886 # 02 Y:2011 02 2011 METER WASTE WATER $5,529 $2,500 Implemented
GT0886 # 03 Y:2011 03 2011 DEVELOP A REPAIR/REPLACE POLICY $3,617 $9,994 Implemented
GT0886 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $51,129 $25,000 Implemented
GT0886 # 05 Y:2011 05 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $24,782 $14,000 Implemented
SF0396 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $339 $310 Implemented
SF0396 # 09 Y:2011 09 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $583 $2,107 Implemented
SF0396 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,045 $22,410 Implemented
SF0396 # 10 Y:2011 10 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,040 $23,228 Implemented
SF0396 # 02 Y:2011 02 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,498 $1,199 Implemented
SF0396 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,923 $0 Implemented
SF0396 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $5,645 $7,073 Implemented
SF0396 # 06 Y:2011 06 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $605 $1,540 Implemented
WV0249 # 08 Y:2002 08 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,799 $200 Implemented
WV0249 # 09 Y:2002 09 2002 INSTALL OCCUPANCY SENSORS $535 $750 Implemented
WV0249 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,077 $88 Implemented
WV0249 # 01 Y:2002 01 2002 USE OPTIMUM THICKNESS INSULATION $5,252 $1,650 Implemented
WV0249 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,366 $440 Implemented
WV0249 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,868 $550 Implemented
WV0249 # 12 Y:2002 12 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $672 $200 Implemented
WV0247 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $5,402 $305 Implemented