IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2679 Converted Paper Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0003 # 07 Y:2012 07 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,160 $900 Not Implemented
WM0003 # 06 Y:2012 06 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $493 $99 Not Implemented
WM0003 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $360 Implemented
WM0003 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $120 Implemented
WM0003 # 03 Y:2012 03 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,223 $0 Not Implemented
WM0003 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $2,091 $0 Not Implemented
WM0003 # 01 Y:2012 01 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,254 $600 Implemented
IC0136 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $2,224 $5,038 Implemented
IC0136 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,802 $9,080 Implemented
IC0136 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,294 $5,851 Not Implemented
IC0136 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,389 $3,105 Implemented
IC0136 # 05 Y:2007 05 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,287 $17,000 Not Implemented
IC0136 # 06 Y:2007 06 2007 REDUCE VENTILATION AIR $23,044 $0 Not Implemented
IC0136 # 07 Y:2007 07 2007 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $9,042 $26,000 Not Implemented
WI0497 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,421 $0 Implemented
WI0497 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $60 Implemented
WI0497 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,656 $500 Implemented
WI0497 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,445 $86,400 Implemented
WI0497 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $42,415 $4,000 Not Implemented
WI0497 # 01 Y:2005 01 2005 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $72,000 $85,000 Not Implemented
WI0297 # 02 Y:1997 02 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,631 $0 Not Implemented
WI0297 # 01 Y:1997 01 1997 INSTALL SENSORS TO DETECT DEFECTS $30,000 $36,750 Implemented
WI0297 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $100 $150 Not Implemented
WI0297 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $261 $0 Not Implemented
WI0297 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $261 $0 Implemented