IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,540

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0598 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,315 $18,065 Implemented
MA0598 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $4,500 $4,314 Implemented
MA0598 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $300 Implemented
AM0502 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $288,000 $675,000 Implemented
AM0502 # 02 Y:2006 02 2006 REUSE RAGS UNTIL COMPLETELY SOILED $82,500 $0 Implemented
AM0502 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $39,000 $6,000 Implemented
AM0502 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $29,100 $15,000 Implemented
AM0502 # 06 Y:2006 06 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,983 $0 Implemented
AM0502 # 08 Y:2006 08 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,900 $1,000 Implemented
AM0502 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,900 $1,000 Implemented
AM0502 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $3,340 $340 Implemented
AM0502 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,200 $2,730 Implemented
AM0502 # 13 Y:2006 13 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $510 Implemented
AM0502 # 14 Y:2006 14 2006 USE PHOTOCELL CONTROLS $200 $0 Implemented
WI0505 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $105,600 $2,700 Implemented
WI0505 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,774 $6,289 Implemented
WI0505 # 05 Y:2006 05 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,205 $7,840 Implemented
WI0505 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,153 $0 Implemented
LM0107 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,219 $2,200 Implemented
LM0107 # 03 Y:2006 03 2006 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $225,208 $12,980 Implemented
LM0107 # 04 Y:2006 04 2006 DEVELOP STANDARD OPERATING PROCEDURES $178,334 $5,400 Implemented
LM0107 # 05 Y:2006 05 2006 ADOPT IN-HOUSE MATERIAL GENERATION $16,864 $1,000 Implemented
LM0107 # 06 Y:2006 06 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,251 $1,000 Implemented
AM0498 # 04 Y:2005 04 2005 REUSE RAGS UNTIL COMPLETELY SOILED $1,580 $0 Implemented
AM0498 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,480 $770 Implemented