Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,540
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0356 # 12 Y:2003 | 12 | 2003 | CLEAR AND RENT EXISTING SPACE | $96,000 | $8,340 | Implemented |
WI0446 # 01 Y:2003 | 01 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $20,491 | $40,000 | Implemented |
WI0446 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,528 | $500 | Implemented |
WI0446 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,093 | $1,359 | Implemented |
WI0446 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $945 | $740 | Implemented |
GT0758 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,720 | $47,268 | Implemented |
GT0758 # 02 Y:2003 | 02 | 2003 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $9,072 | $12,000 | Implemented |
GT0758 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $322 | $0 | Implemented |
GT0758 # 08 Y:2003 | 08 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,420 | $1,850 | Implemented |
LM0057 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $543 | $1,430 | Implemented |
LM0057 # 02 Y:2003 | 02 | 2003 | ADD AREA LIGHTING SWITCHES | $2,375 | $3,580 | Implemented |
LM0057 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $568 | $140 | Implemented |
LM0057 # 04 Y:2003 | 04 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $140,025 | $42,126 | Implemented |
LM0057 # 05 Y:2003 | 05 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $47,858 | $12,520 | Implemented |
SF0255 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,228 | $140 | Implemented |
SF0255 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,226 | $3,400 | Implemented |
SF0255 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $353 | $796 | Implemented |
UF0316 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $993 | $0 | Implemented |
UF0316 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,383 | $340 | Implemented |
UF0316 # 09 Y:2003 | 09 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,064 | $5,000 | Implemented |
UF0316 # 10 Y:2003 | 10 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,300 | $41,637 | Implemented |
UF0315 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,085 | $353 | Implemented |
UF0315 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,831 | $4,121 | Implemented |
UF0315 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,039 | $1,906 | Implemented |
UF0315 # 08 Y:2003 | 08 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,301 | $260 | Implemented |