Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0133 # 10 Y:2015 | 10 | 2015 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,848 | $2,636 | Implemented |
UA0133 # 05 Y:2015 | 05 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,308 | $10,240 | Implemented |
UA0133 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,236 | $783 | Implemented |
UA0133 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,902 | $13,479 | Implemented |
UA0133 # 01 Y:2015 | 01 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,351 | $1,728 | Implemented |
UA0133 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,161 | $2,500 | Implemented |
UA0133 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,421 | $50 | Implemented |
UA0133 # 09 Y:2015 | 09 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $2,180 | $0 | Implemented |
GT0779 # 01 Y:2004 | 01 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,183 | $5,000 | Implemented |
GT0779 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $300 | Implemented |
GT0779 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $303 | $1,000 | Implemented |
GT0779 # 02 Y:2004 | 02 | 2004 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $590 | $2,700 | Implemented |
GT0758 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,720 | $47,268 | Implemented |
GT0758 # 02 Y:2003 | 02 | 2003 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $9,072 | $12,000 | Implemented |
GT0758 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $322 | $0 | Implemented |
GT0758 # 08 Y:2003 | 08 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,420 | $1,850 | Implemented |
GT0656 # 01 Y:1998 | 01 | 1998 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,632 | $7,000 | Implemented |
GT0656 # 03 Y:1998 | 03 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,440 | $0 | Implemented |
GT0656 # 04 Y:1998 | 04 | 1998 | AUTOMATE FINISHING PROCESS | $15,600 | $15,000 | Implemented |
GT0587 # 06 Y:1996 | 06 | 1996 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $7,300 | $503 | Implemented |
GT0587 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,400 | $14,090 | Implemented |
GT0587 # 01 Y:1996 | 01 | 1996 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,034 | $0 | Implemented |
GT0580 # 05 Y:1996 | 05 | 1996 | USE SYNTHETIC LUBRICANT | $220 | $0 | Implemented |
GT0580 # 06 Y:1996 | 06 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,160 | $21,465 | Implemented |
GT0580 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,630 | $400 | Implemented |