Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,080
matching recommendationsSIC | 2711 | Newspapers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0146 # 07 Y:2007 | 07 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,866 | $2,373 | Not Implemented |
MI0146 # 08 Y:2007 | 08 | 2007 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,920 | $4,160 | Not Implemented |
AM0518 # 01 Y:2006 | 01 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $44,220 | $1,000 | Implemented |
AM0518 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,840 | $2,500 | Not Implemented |
AM0518 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $4,000 | $415 | Implemented |
AM0518 # 04 Y:2006 | 04 | 2006 | REUSE RAGS UNTIL COMPLETELY SOILED | $3,850 | $0 | Implemented |
AM0518 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,280 | $500 | Implemented |
AM0518 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $280 | $0 | Implemented |
UF0383 # 01 Y:2006 | 01 | 2006 | USE PHOTOCELL CONTROLS | $952 | $954 | Not Implemented |
UF0383 # 02 Y:2006 | 02 | 2006 | INSTALL OCCUPANCY SENSORS | $3,247 | $456 | Not Implemented |
UF0383 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,179 | $126 | Implemented |
UF0383 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,149 | $1,296 | Implemented |
UF0383 # 05 Y:2006 | 05 | 2006 | ISOLATE HOT OR COLD EQUIPMENT | $602 | $85 | Not Implemented |
UF0383 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,891 | $2,960 | Not Implemented |
UF0383 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,618 | $0 | Not Implemented |
UF0383 # 08 Y:2006 | 08 | 2006 | PAY UTILITY BILLS ON TIME | $235 | $0 | Implemented |
MA0600 # 01 Y:2006 | 01 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $24,000 | $0 | Not Implemented |
MA0600 # 02 Y:2006 | 02 | 2006 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $8,271 | $12,700 | Not Implemented |
MA0600 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,209 | $17,438 | Not Implemented |
MA0600 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $5,321 | $10,000 | Not Implemented |
MA0600 # 05 Y:2006 | 05 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,683 | $2,000 | Not Implemented |
MA0600 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,507 | $5,000 | Not Implemented |
AM0502 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $288,000 | $675,000 | Implemented |
AM0502 # 02 Y:2006 | 02 | 2006 | REUSE RAGS UNTIL COMPLETELY SOILED | $82,500 | $0 | Implemented |
AM0502 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $39,000 | $6,000 | Implemented |