IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0250 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $162 $0 Implemented
WI0250 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,543 $2,000 Implemented
OK0478 # 09 Y:1995 09 1995 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $8,089 $4,295 Implemented
OK0478 # 11 Y:1995 11 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,300 $0 Implemented
OK0478 # 10 Y:1995 10 1995 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $6,080 $500 Implemented
OK0478 # 08 Y:1995 08 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,578 $1,000 Implemented
OK0478 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,374 $48,000 Implemented
OK0478 # 01 Y:1995 01 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $63,653 $25,000 Implemented
UL0140 # 04 Y:1995 04 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,678 $0 Implemented
UL0140 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,580 $2,038 Implemented
UL0140 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $191 $20 Implemented
WI0240 # 04 Y:1995 04 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,795 $400 Implemented
WI0240 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,265 $640 Implemented
WI0240 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,025 $300 Implemented
HO0099 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,584 $11,286 Implemented
HO0099 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $276 $365 Implemented
HO0099 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $95 $236 Implemented
BD0028 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,733 $500 Implemented
ME0157 # 02 Y:1995 02 1995 USE OPTIMUM THICKNESS INSULATION $2,340 $870 Implemented
ME0157 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $300 Implemented
ME0157 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $800 Implemented
ME0157 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,175 $3,519 Implemented
ME0157 # 08 Y:1995 08 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $455 $400 Implemented
ME0157 # 07 Y:1995 07 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $736 $0 Implemented
WI0231 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $17,959 $500 Implemented