IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

360

matching recommendations
Reset
SIC 276 Manifold Business Forms
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0003 # 04 Y:2001 04 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,110 $0 Implemented
TA0003 # 06 Y:2001 06 2001 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,195 $12,855 Not Implemented
TA0003 # 07 Y:2001 07 2001 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $838 $624 Implemented
TA0003 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $470 $175 Not Implemented
TA0003 # 09 Y:2001 09 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $288 $0 Not Implemented
UF0256 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,166 $320 n/a
UF0256 # 09 Y:2000 09 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,944 $25,000 n/a
UF0256 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $593 $0 n/a
UF0256 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $231 $300 n/a
UF0256 # 03 Y:2000 03 2000 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,915 $50 n/a
UF0256 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,388 $1,261 n/a
UF0256 # 01 Y:2000 01 2000 INSTALL TIMERS AND/OR THERMOSTATS $5,306 $650 n/a
UF0256 # 07 Y:2000 07 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $134 $200 n/a
UF0256 # 08 Y:2000 08 2000 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,547 $20,000 n/a
UF0256 # 12 Y:2000 12 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $150,000 $100,000 n/a
UF0256 # 11 Y:2000 11 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $50,000 $60,000 n/a
UF0256 # 10 Y:2000 10 2000 METER WASTE WATER $377 $1,500 n/a
IA0216 # 07 Y:1999 07 1999 RECOVER AND REUSE WASTE MATERIAL $15,502 $265 Implemented
IA0216 # 06 Y:1999 06 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $209,151 $182,650 Implemented
IA0216 # 05 Y:1999 05 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $5,826 $7,750 Not Implemented
IA0216 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $657 $399 Not Implemented
IA0216 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,089 $50 Not Implemented
IA0216 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,677 $6,766 Implemented
IA0216 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,823 $236 Implemented
WI0333 # 09 Y:1998 09 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $456 $640 Not Implemented