IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 279 Printing Trade Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0272 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $651 $1,500 Implemented
TT0272 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,040 $63 Implemented
TT0272 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,414 $200 Implemented
SU0351 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $115 $0 Implemented
SU0351 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,244 $455 Implemented
SU0351 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $361 $399 Implemented
SU0351 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,135 $0 Implemented
WM0024 # 06 Y:2013 06 2013 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $827 $2,009 Implemented
WM0024 # 03 Y:2013 03 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,156 $0 Implemented
WM0024 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $0 Implemented
WM0024 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $950 $550 Implemented
UD0846 # 08 Y:2012 08 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,712 $38,000 Implemented
UD0846 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $601 $1,000 Implemented
UD0846 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,212 $2,054 Implemented
UD0846 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,567 $0 Implemented
ND0310 # 01 Y:1998 01 1998 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $9,419 $24,900 Implemented
ND0310 # 02 Y:1998 02 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $27,164 $9,600 Implemented
ND0310 # 03 Y:1998 03 1998 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $56,650 $65,000 Implemented
ND0310 # 04 Y:1998 04 1998 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,487 $0 Implemented
SF0147 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $373 $607 Implemented
SF0147 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,399 $31,690 Implemented
UL0171 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $5,423 $6,179 Implemented
UL0171 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $3,020 Implemented
UL0171 # 05 Y:1996 05 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,800 $0 Implemented
MA0226 # 04 Y:1991 04 1991 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,079 $9,000 Implemented