IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,737

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0584 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,030 $100 n/a
LE0584 # 05 Y:2025 05 2025 INSTALL BACK-UP EQUIPMENT $148,846 $350,000 n/a
LE0584 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,377 $2,400 n/a
LE0584 # 06 Y:2025 06 2025 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,853 $5,000 n/a
LE0584 # 07 Y:2025 07 2025 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,000 $31,500 n/a
LE0584 # 03 Y:2025 03 2025 INSTALL TIMERS AND/OR THERMOSTATS $1,504 $600 n/a
LE0584 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,871 $0 n/a
LE0584 # 08 Y:2025 08 2025 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,045 $30,000 n/a
UD1096 # 03 Y:2024 03 2024 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $10,522 $1,061 n/a
UD1096 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,767 $6,096 n/a
UD1096 # 01 Y:2024 01 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,966 $0 n/a
UD1096 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $24,210 $242,106 n/a
UD1096 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $780 $872 n/a
UD1096 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $407 $0 n/a
UD1096 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,551 $5,809 n/a
WV0674 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $122 n/a
WV0674 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,374 $8,262 n/a
WV0674 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $225 $88 n/a
WV0674 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,766 $8,674 n/a
WV0674 # 04 Y:2024 04 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $696 $1,133 n/a
WV0674 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $148 $482 n/a
WV0674 # 03 Y:2024 03 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,331 $12,440 n/a
WV0674 # 06 Y:2024 06 2024 UPGRADE CONTROLS ON COMPRESSORS $562 $2,318 n/a
WV0674 # 05 Y:2024 05 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $658 $3,214 n/a
UU0258 # 08 Y:2024 08 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $180,000 $20,000 n/a