7,802
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0380 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO HEAT WATER | $17,031 | $8,409 | n/a |
MI0380 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,433 | $12,201 | n/a |
MI0380 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,272 | $11,460 | n/a |
MI0380 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,753 | $3,280 | n/a |
MI0380 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,277 | $853 | n/a |
MI0380 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,175 | $1,980 | n/a |
MI0380 # 07 Y:2020 | 07 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $568 | $120 | n/a |
MI0380 # 08 Y:2020 | 08 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $421 | $1,231 | n/a |
LE0498 # 01 Y:2021 | 01 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,052 | $0 | n/a |
LE0498 # 02 Y:2021 | 02 | 2021 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $226 | $50 | n/a |
LE0498 # 03 Y:2021 | 03 | 2021 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,147 | $9,248 | n/a |
LE0498 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,427 | $3,800 | n/a |
LE0498 # 05 Y:2021 | 05 | 2021 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,592 | $40,000 | n/a |
LE0498 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,503 | $7,000 | n/a |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | n/a |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | n/a |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | n/a |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | n/a |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | n/a |
UD1024 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $454 | $0 | n/a |
UD1024 # 02 Y:2020 | 02 | 2020 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $44,273 | $40,000 | n/a |
UD1024 # 03 Y:2020 | 03 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $37,324 | $1,300 | n/a |
UD1024 # 04 Y:2020 | 04 | 2020 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $15,421 | $0 | n/a |
UD1024 # 05 Y:2020 | 05 | 2020 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $921,416 | $672,400 | n/a |
UD1024 # 06 Y:2020 | 06 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $52,582 | $24,500 | n/a |