IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,859

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0041 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $238,833 $700,000 Implemented
NL0041 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $10,636 $52,000 Implemented
NL0041 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,751 $600 Implemented
NL0041 # 04 Y:2019 04 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,670 $100 Implemented
NL0041 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5,000 $19,750 Implemented
NL0041 # 07 Y:2019 07 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,123 $200 Implemented
NL0041 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $674 Implemented
UF0541 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $365,719 $1,800,000 Implemented
UF0541 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $40,964 $16,606 Implemented
UF0541 # 03 Y:2019 03 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,041 $3,368 Implemented
UF0541 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $11,463 $2,551 Implemented
UF0541 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,871 $1,550 Implemented
GT0934 # 01 Y:2019 01 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,153 $250 Implemented
GT0934 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $2,334 $1,238 Implemented
GT0934 # 05 Y:2019 05 2019 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $445 $2,770 Implemented
GT0934 # 06 Y:2019 06 2019 USE SOLAR HEAT FOR HEAT $37,938 $246,597 Implemented
SF0547 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,284 $0 Implemented
SF0547 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,962 $360 Implemented
SF0547 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,625 $240 Implemented
SF0547 # 06 Y:2019 06 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,127 $1,647 Implemented
SF0547 # 08 Y:2019 08 2019 AIR CONDITION ONLY SPACE NECESSARY $17,743 $33,601 Implemented
SF0547 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $3,114 $6,574 Implemented
LE0482 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,428 $1,040 Implemented
LE0482 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $14,878 $3,810 Implemented
LE0482 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $743 $2,613 Implemented