IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,870

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0141 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,733 $24,016 Implemented
IC0141 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,800 $49,250 Implemented
IC0141 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,794 $14,000 Implemented
IC0141 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,000 $11,500 Implemented
IC0141 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,750 $1,400 Implemented
DL0013 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,300 $0 Implemented
DL0013 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $2,396 $285 Implemented
DL0013 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $108,300 $104,800 Implemented
DL0013 # 04 Y:2008 04 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $24,218 $25,000 Implemented
DL0013 # 05 Y:2008 05 2008 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,700 $10,000 Implemented
MZ0020 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,223 $900 Implemented
MZ0020 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $702 $2,210 Implemented
MZ0020 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $222 $910 Implemented
MZ0020 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $127 $570 Implemented
MZ0020 # 06 Y:2008 06 2008 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $7,280 $0 Implemented
MZ0020 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,500 $0 Implemented
MS0326 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $1,062,600 $94 Implemented
MS0326 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,624 $376 Implemented
MS0326 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,110 $500 Implemented
MI0162 # 02 Y:2008 02 2008 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $98,398 $18,460 Implemented
MI0162 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $73,832 $1,750 Implemented
MI0162 # 06 Y:2008 06 2008 REPAIR OR REPLACE STEAM TRAPS $11,109 $400 Implemented
MI0162 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,769 $1,210 Implemented
MI0162 # 09 Y:2008 09 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,630 $40 Implemented
AM0540 # 01 Y:2008 01 2008 REPAIR OR REPLACE STEAM TRAPS $700,000 $117,000 Implemented