IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,870

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0734 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,320 $12,300 Implemented
GT0734 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,380 $3,036 Implemented
LL0134 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,068 $210 Implemented
LL0134 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $90 Implemented
LL0134 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $167 $30 Implemented
LE0132 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $675 $130 Implemented
LE0132 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,409 $0 Implemented
SD0291 # 04 Y:2002 04 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $22,460 $1,500 Implemented
SD0291 # 05 Y:2002 05 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,452 $0 Implemented
SD0291 # 06 Y:2002 06 2002 RECYCLE NONFERROUS DUST $2,530 $0 Implemented
AM0412 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $140,200 $5,100 Implemented
AM0412 # 06 Y:2002 06 2002 REPAIR AND ELIMINATE STEAM LEAKS $104,625 $11,800 Implemented
AM0412 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $60,150 $202,680 Implemented
AM0412 # 09 Y:2002 09 2002 REPAIR OR REPLACE STEAM TRAPS $24,450 $1,375 Implemented
AM0412 # 12 Y:2002 12 2002 OPTIMIZE PLANT POWER FACTOR $6,560 $0 Implemented
AM0412 # 14 Y:2002 14 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,000 $0 Implemented
AM0412 # 15 Y:2002 15 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $780 $0 Implemented
LL0129 # 01 Y:2002 01 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $191,600 $22,000 Implemented
LL0129 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $121,713 $95,025 Implemented
LL0129 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,381 $28,907 Implemented
LL0129 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $52,853 $12,720 Implemented
LL0129 # 08 Y:2002 08 2002 RECOVER WASTE HEAT FROM EQUIPMENT $36,741 $7,200 Implemented
LE0129 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,028 $2,500 Implemented
LE0129 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,610 $500 Implemented
LE0129 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $723 $0 Implemented